This 42,000 SF facility was designed to withstand extreme weather events and potential terrorist attacks. With three emergency backup generators, including two natural gas generators and one diesel generator, the facility can operate several days if such an event occurs.
The center also features 72 call-taker stations with upgraded software, a laundry room, and sleeping quarters. LEED Silver Certified.
Client
Harris County
Services
MEP Engineering Design, Construction Administration
Date
2019
Size
42,000 SF
Features based on events and occasions.